Energy

MAJOR ENERGY PROJECTS ...

Sr. Location Project Name
1. AFGHANISTAN JICA Funded: Detailed Design of Electrical Works for Kabul New City, Phase – I, DCDA. Following list of works are as under:
a. Main Supply for Grid Station 220KV Line From CHIMTALA, Length 20KM
b. From Grid Station to MDS-1 (Main Distribution Switch-1) 220KV Line, Length 2.7 KM
c. From Grid Station to MDS-2 (Main Distribution Switch-1) 220KV Line, Length 3.0 KM
d. From Grid Station to MDS-3 (Main Distribution Switch-1) 220KV Line, Length 6.0 KM
e. From Grid Station to MDS-4 (Main Distribution Switch-1) 220KV Line, Length 8.0 KM
f. From Grid Station to MDS-5 (Main Distribution Switch-1) 220KV Line, Length 8.5 KM
g. From Grid Station to MDS-6 (Main Distribution Switch-1) 220KV Line, Length 5.6 KM
h. From Grid Station to MDS-7 (Main Distribution Switch-1) 220KV Line, Length 6.6 KM
i. From Grid Station to MDS-8 (Main Distribution Switch-1) 220KV Line, Length 11.5 KM
j. From Grid Station to MDS-9 (Main Distribution Switch-1) 220KV Line, Length 12.9 KM
k. From MDS to Substation Line 220KV Line
l. From Substation to FidderPiller 400V Lin
m. From FidderPiller to Meter 400V Line.