Railways

MAJOR RAILWAYS PROJECTS ...

Sr. Location Project Name
1. AFGHANISTAN Feasibility Study For New Rail Link Between Peshawar And Jalalabad (145 KM). Afghanistan.
2. PAKISTAN Feasibility Study, Detailed Design and Construction Supervision for Rehabilitation and Improvement of Track From Quetta to KohiTaftan – 680 KM. Pakistan.
3. PAKISTAN Feasibility Study, Detailed Design and Construction Supervision For Doubling Of Track From Golra Sharif To Peshawar Cantt Including Realignment Of Existing Track including railway bridges over Indus River, Haro River and Ghazi Brotha Canal. (Length 160 Km), Pakistan.
4. PAKISTAN Preparation of Revalidation Report on the Feasibility Report of JETRO for Revival of Karachi Circular Railway (50 KM), Pakistan.
5. PAKISTAN Feasibility Study for Rail Link Between Karachi and Hub Town (65 KM), Pakistan.